• High Voltage Primary Current Injection Test System
  • High Voltage Primary Current Injection Test System
  • High Voltage Primary Current Injection Test System
  • High Voltage Primary Current Injection Test System
  • High Voltage Primary Current Injection Test System
  • High Voltage Primary Current Injection Test System

High Voltage Primary Current Injection Test System

After-sales Service: Lifetime Technical Support
Warranty: 1 Year for Primary Current Injection Test System
Product Name: High Voltage Primary Current Injection Test System
Test Standard: IEC60060/IEC62271
Power Supply: 220V, 50Hz
Output Capacity: 3kVA~150kVA
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SLQ
Output Current
500A~25000A
Function
Supply Large Current for Current Transformer
Item Description
Digital Control 5000A Primary Current Injection
Usage
Primary Current Injection Test Set
Transport Package
Veneer Case
Specification
as different requirements
Trademark
GOLD
Origin
Chongqing, China
HS Code
9031809090
Production Capacity
200PCS/Month

Product Description

High Voltage Primary Current Injection Test System 
 

High Voltage Primary Current Injection Test System

 

What is done during the Primary Injection Test?  

 
High Voltage Primary Current Injection Test System

Acceptance and Maintenance Tests

In the field using a portable primary injection test kitmaintenance and Acceptance tests are carried out specially intended to be smaller than factory test equipment.

For proper operation Circuit breakers with electromechanical or thermal-magnetic trip devices may only be tested using the primary current injection technique. The secondary current injection may test circuit breakers equipped with solid-state trip mechanisms, saving time and money.


Primary Current Testing

A primary injection testis performed by passing a predetermined series of overload and fault magnitude currents. It is effected using a circuit breaker and recording how long it takes the trip unit to trigger. Electricity is continuously injected into all three poles of a circuit breaker when these tests are conducted in a repair facility or factory. 


Integration

In the test set fault current or simulated overload is supplied by an integrated high-current transformer. Test sets with current ratings ranging from 500 to 100,000 amperes are constructed. Acceptance and maintenance tests are carried out in the field using a portable primary injection test set specially intended to be smaller than factory test equipment. These smaller test sets are often incapable of concurrently injecting electricity into all three phases of a circuit breaker.

High Voltage Primary Current Injection Test System
 


Parameter

 
High Voltage Primary Current Injection Test System
 
 
Schematic
High Voltage Primary Current Injection Test System
 
 
High Voltage Primary Current Injection Test System
 
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
100800000 RMB
Plant Area
>2000 square meters