• Primary Current Injection Test Set Factory Price Strong Current Generator
  • Primary Current Injection Test Set Factory Price Strong Current Generator
  • Primary Current Injection Test Set Factory Price Strong Current Generator
  • Primary Current Injection Test Set Factory Price Strong Current Generator
  • Primary Current Injection Test Set Factory Price Strong Current Generator
  • Primary Current Injection Test Set Factory Price Strong Current Generator

Primary Current Injection Test Set Factory Price Strong Current Generator

After-sales Service: Lifetime Technical Support
Warranty: 1 Year for Factory Price Strong Current Generator
Mass Scope of Workpiece: <900kg
Type: Primary Current Injection Test Set Strong Current
Accuracy Grade: 1
Load Way: Electronic Load
Samples:
US$ 2800/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
SLQ
Loading Method
Static Load
Display
Digital
Control
Manual Control
Weight
as Different Requirements
Power Source
AC220V
Product Name
Primary Current Injection Test Set Strong Current
Output Capacity
3kVA~150kVA
Output Current
500A~25000A
Power Supply
220V, 50Hz
Function
Supply Large Current for Current Transformer
Item Description
Digital Control 5000A Primary Current Injection
Usage
Primary Current Injection Test Set
Test Standard
IEC60060/IEC62271
Transport Package
Veneer Case
Specification
as different requirements
Trademark
GOLD
Origin
Chongqing, China
HS Code
9031809090
Production Capacity
200PCS/Month

Product Description

Primary Current Injection Test Set Factory Price Strong Current Generator
 

Primary Current Injection Test Set Factory Price Strong Current Generator
Primary Current Injection Test Set Factory Price Strong Current Generator


Introduction:

  • SLQ series Primary Current Injection Test Set Factory Price Strong Current Generator is a sort of special equipment designed and manufactured for experimentation of electrics of power business as well as industrial and mining enterprises, and which is applicable to testing on current load and temperature increase of various switches, current transformers and other electric equipment.
  • Separated/integral structure is adopted for this series of converter in light of different volume and weight, in addition, it's characterized as polar-less adjustment of output current, stable increase of current, large scope of load variation,reliable function, easy and safe operation and etc.
  • Thus, it's ideal to adopt as current source equipment for current/temperature increase of industrial and mining equipment.

Specification:

 
Type Capacity
(kva)
Power supply Output Impedance voltage % Idle current % mode
I(A) V(V) I(A) V(V)
SLQ-5/500 3 13.6 220 500 5 >8 >6 single
SLQ -5/1000 5 22.7 220 1000 5 >8 >6 single
SLQ -10/2000 10 46 220 2000 5 >8 >6 Separated
SLQ -12/4000 12 30 400 2000/4000 6/3 >8 >6 Separated
SLQ -15/5000 15 37.5 400 2500/5000 6/3 >8 >6 Separated
SLQ -150/25kA 150 375 400 25000 6 >8 >6 Separated

Primary Current Injection Test Set Factory Price Strong Current Generator

The primary current injection method is commonly preferred for testing circuit breakers because it includes the current sensors, wiring, and the current conduction path in the test. However, this method has a drawback as it may not always detect problems related to sensor wiring and polarity.

This issue arises because the primary injection test is conducted on a single phase of the circuit breaker at a time, whereas the solid-state trip logic of the breaker processes signals from all three-phase sensors simultaneously. To identify problems related to sensors and wiring in circuit breakers, it is recommended to conduct the primary current injection test simultaneously on all three phases when testing solid-state trip units.

If conducting three-phase primary injection is not feasible, the sensors and wiring of the circuit breaker should be tested separately to ensure their proper functioning. The trip unit's functionality can be tested by performing primary current injection on one phase at a time. Additionally, two adjacent phases can be connected in series and tested as three pairs to check for current sensor polarity issues.

Since primary current injection testing can be relatively expensive, it is typically performed during the commissioning process to supplement periodic secondary-current testing programs. Circuit breakers that are part of critical processes or engineered safety systems often undergo maintenance testing using primary injection due to their high reliability requirements.



Detail Show:

Primary Current Injection Test Set Factory Price Strong Current GeneratorPrimary Current Injection Test Set Factory Price Strong Current Generator
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
100800000 RMB
Plant Area
>2000 square meters