Customization: | Available |
---|---|
After-sales Service: | 2 Years |
Warranty: | 2 Years |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
(1) Temperature controller I for cold trough I (2) Cold trough I (3) Main power supply switch (4) Cold trough II
(5) Temperature controller for cold trough II
1. The upper surface of the instrument is made of stainless steel. The two baths at left side form the cold trough I, and the two baths at right side form the cold trough II. Both cold trough I and cold trough II can be used for pour point and cloud point test.
2. The right side of the instrument is controlling parts. The temperature controller I and temperature controller II are used to control temperature in the cold trough I and cold trough II respectively. The power supply switch is used to control power supply of the instrument. The three cores socket at back of the instrument is the socket of power supply wire.
3. There is a refrigeration compressor system installed in the inside of the instrument. The system is a refrigeration chamber of the instrument. It is forbidden for nonprofessional to disassemble the working chamber.
4. Controlling parts of the main unit
Power supply switch of main unit: turn on the switch, and the indication light will be on. Connect the main unit to power supply and it begins to work.
1. Pour and Cloud Point Apparatus should be placed on the flat and solid work table, and air convection should be minimized in the environment.
2. This product may involve flammable materials when used, and no open fire (or device producing Mars) is allowed around the operation.
3. When the instrument is not in use, it should be placed in a dry and ventilated place.
Power supply |
AC 220V + / - 10%; 50 hz |
Cold tank temperature control |
Cold trough one and Cold trough two |
Cold trough one |
Room temperature ~ - 50 ºC, plus or minus 1 ºC, two bath isothermal |
Cold trough two |
At room temperature to 70 ºC, + / - 1 ºC, two bath isothermal |
Refrigeration system |
New refrigeration compressor |
The environment temperature |
30 ºC or less |
Power consumption | No more than 1500W |
No | Name | Unit | Quantity | Remark |
1 | Main unit | Piece | 1 | |
2 | Pour point thermometer (one set) | Piece | 2 | As per GB514 |
3 | Pour point test tube stopper | Piece | 4 | |
4 | Pour point test tube | Piece | 4 | |
5 | Bath cover | Piece | 4 | |
6 | "O" ring (Φ35×3.1) | Piece | 4 | |
7 | Round dish | Piece | 4 | Felt gasket |
8 | Power supply wire (250 V 10 A) | Piece | 1 | |
9 | Fuse 15 A (Φ5×20) | Piece | 2 | |
10 | Holder | Piece | 1 | |
11 | Stop collar for thermometer(1#) | Piece | 2 |
What service can our company provide you?
Pre-sale Service:
1. The professional sales team will reply to the inquiry in real time;
2. Customize suitable solutions according to the needs of different customers;
3. Provide product technical parameters/operation manuals and evaluation reports, etc.;
After-sale Service:
1.From the date of purchase within one year instrument, is a product quality problem free repair replacement, lifetime supply of maintenance and technical services.
2.Technical Support
(1)Our technical team supports our customers at all time with our long experience, expert advice and the unlimited spirit and always be for providing the best customer service.
(2)Training how to install the machine,you can arrange your engineer to our company to get free training.
(3)If necessary, we can also arrange our engineer to your company for training and commissioning at your cost.
3.The instrument has found anomalies or malfunctions please contact us to arrange the most convenient treatment options.