• 100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil
  • 100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil
  • 100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil
  • 100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil
  • 100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil

100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil

Test Standards: IEC60156
Output Voltage: AC 0~80kv/AC 0~100kv
Rate of Voltage Rise: 2kv/S±10%
Measuring Precision: 3%Rdg+0.3%Fs
Test Times Setting: 1~9
Mixing Time Setting: 0~99 Second
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
GDYJ-501
Waiting Time Setting
0-9 Minute 59second
Maximum Storage Capacity
100 Groups of Test Data
Display
256*128 LCD
Rated Power Supply
AC 220V±10% 50Hz/60Hz
Environment Temperatures
0-50°c
Relative Humidity
≤80%Rh
Size
420×380×410mm3
Weight
28kg
28kg
Yes
Transport Package
Standard Wooden Case
Specification
420*380*410mm
Trademark
GOLD
Origin
Chongqing China(Mainland)
HS Code
9031809090
Production Capacity
500 Sets/Month

Product Description

IEC 100KV  Dielectric strength Transformer insulating oil  bdv tester

 

1. Introduction:                                                                                   

  • GDYJ-501 China Cheap Price IEC60156 Transformer Oil BDV Test Set is developed according to IEC156 Insulating Oil Dielectric Strength Testing Method;

  • LCD screen can display test procedure and test result. All the human interaction operations complete by the rotating mouse.

  • It is very easy for customers to measure the breakdown voltage of all kinds of oil by it.You can print the test result by the micro printer internal the tester. Of course, you can upload the test data to PC from RS232 for data analyzing. The special circuit design makes the tester has a good performance at stability and anti-noise.

 

Specifications:

1

Output voltage

AC 0~80KV/AC 0~100KV

2

Rate of voltage rise

2KV/s±10%

3

Measuring precision

3%RDG+0.3%FS

4

Test times setting

1~9

5

Mixing time setting

0~99 second

6

Waiting time setting

0-9 minute 59second

7

Maximum storage capacity

100 groups of test data

8

Test standards

IEC60156

9

Display

256*128 LCD

10

Rated power supply

AC 220V±10% 50Hz/60Hz

11

Environment temperatures

0-50°C

12

Relative humidity

≤80%RH

13

Size

420×380×410mm3

14

Weight

28kg

 

Functions:

  • Breakdown test of user-defined;

  • Proof test;

  • Calibration interface for customers;

  • Unloading data to PC and making word report automatically;

  • Result print;


 

2. company information
 

 

CHONGQING GOLD MECHANICAL & ELECTRICAL EQUIPMENT CO., LTD

        100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil

Chongqing Gold Mechanical & Electrical Equipment Co.,Ltd.  mainly design and manufacture the oil purifier and electrical testing equipment for more than 10 years.

After several years' development, our products have become high intelligent and wide coverage. And our company has become one of the leading manufacturer of oil purifier and electrical testing equipment in China;

We have developed sales channels in many countries such as UAE, Saudi Arabia, Iran, Malaysia, Thailand, Pakistan, India, Germany, Belgium, USA, Mexico, Kenya, Nigeria, South Africa and other countries worldwide.

And we have gained strong advantage and high reputation in international market.

We have persisted on the business idea of "Integrity Basis and Quality First" for the stable and constant development. We are making effort to develop together with customers from both domestic and abroad on the basis of reciprocity. Client, quality and service are our supreme target!

3. Overseas exhibition

100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil

 

4. Our Services

Pre-sale Service:

♣Inquiry will be replied within 24 hours. 

♣Welcome to visit our factory. 

♣Technical datas and operation manual sent for evaluation.

After-sale Service:

♣Training how to install the machine, training how to use the machine at our factory.

♣Engineers available to service machinery overseas at customers' cost.

5. Payment

100kv Insulating Oil Dielectric Strength Bdv Tester for Transformer Oil6.FAQ

  • What's the delivery lead time?

"For most of the products, delivery lead time is 10 days after the order is confirmed; For some customized products, please check with the sales person."

  • What's the payment term?

"For total amount below USD3,000.0, payment term is 100% T/T as deposit; For total amount above USD3,000.0, payment term is 30% T/T as deposit, the balance before delivery; The payment term is also negotiable."

  • What's the warranty period?

"Warranty period is 1 year"

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
100800000 RMB
Plant Area
>2000 square meters