• Three Phase Overcurrent Relay Tester Protection Relay Test Set
  • Three Phase Overcurrent Relay Tester Protection Relay Test Set
  • Three Phase Overcurrent Relay Tester Protection Relay Test Set
  • Three Phase Overcurrent Relay Tester Protection Relay Test Set
  • Three Phase Overcurrent Relay Tester Protection Relay Test Set
  • Three Phase Overcurrent Relay Tester Protection Relay Test Set

Three Phase Overcurrent Relay Tester Protection Relay Test Set

After-sales Service: Lifetime Technical Support
Warranty: 1 Year for Three Phase Overcurrent Relay Tester
Type: Secondary Injection Tester
Accuracy Grade: 1
Load Way: Electronic Load
Loading Method: Dynamic Load
Samples:
US$ 3100/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company

Basic Info.

Model NO.
GDJB-PC
Display
Digital
Control
Digital Control
Weight
0-100Kg
Power Source
AC220V
Product Name
Three Phase Overcurrent Relay Tester
Usage
Secondary Injection Testing
Application
Relay Tester
Power
Electronic, AC220V±10% 50Hz
Function
3 Phase Relay Protection Tester
Standard
Dl/T624-1997
Transport Package
Standard Venner Case
Specification
338*168*305mm
Trademark
GOLD
Origin
Chongqing, China
HS Code
9031809090
Production Capacity
1000PCS/Month

Product Description

   
Three Phase Overcurrent Relay Tester Protection Relay Test Set

Three Phase Overcurrent Relay Tester Protection Relay Test Set
 
The Purpose Of Tests

Secondary injection tests are always done prior to primary injection tests. The purpose of secondary injection testing is to prove the correct operation of the protection scheme that is downstream from the inputs to the protection relay(s). Why done prior to primary injection tests? This is because the risks during initial testing to the LV side of the equipment under test are minimized.

Three Phase Overcurrent Relay Tester Protection Relay Test Set

Relay Protection Test ltems
 
Type of relay protection Test items Recommended test module remarks
Signal relay Corresponding test items DC test
Intermediate relay
DC test
If the intermediate relay requires AC and DC mixed input, please test it in the "AC / DC test" module.
If the rated current of the signal relay is too small, it can be tested by the voltage circuit output of the tester.
Time relay
Intermediate relay
Reclosing relay
Current relay Corresponding test items AC test
Current voltage
Inverse time current relay
DC test
 
The sequence component relay can be tested in the special sequence component module of "AC test".
The inverse time relay can also be tested in "inverse time overcurrent".
Over (under) voltage
relay
Sequence component relay
Synchronous check (or phase comparison) relay
Inverse time current relay
Differential relay DC magnetization characteristics Differential relay
Differential test
Harmonic test
 
During the test, please refer to the wiring mode of "differential test" in the manual for correct wiring.
Harmonic braking characteristics
Proportional braking characteristics Differential test
Differential relay
AC test
Power (direction)
relay
Corresponding test items  
Power direction
AC test
 
Before testing the power (direction) relay, the wiring type and the general action boundary of the protection should be determined in advance.
Impedance relay
Synchronizing relay Corresponding test items Simultaneous test
AC test
The UA and UB of the tester are used as the voltage output of the system side and the side to be paralleled respectively in the "synchronization test" module, which can measure the action frequency, action voltage and phase, and carry out automatic quasi synchronization test.
Frequency relay Corresponding test items  
Frequency test
 
 It can be used to test the slip and closing frequency.
 
 
 

Our service

Pre-sale Service:

  • Inquiry will be replied within 24 hours. 
  • Welcome to visit our factory. 
  • Technical datas and operation manual sent for evaluation.

After-sale Service:

  • Training how to instal the machine, training how to use the machine at our factory;
  • Engineers available to service machinery overseas at customers' cost;


Company Information

Three Phase Overcurrent Relay Tester Protection Relay Test Set


Chongqing Gold Mechanical&Electrical Equipment Co.,Ltd was founded in 2008. We have a strong team including top sales, skilled engineers and we have our own manufacture with high quality. we mainly design and manufacture the Transformer Tester, Circuit Breaker Analyzer, CT PT Analyzer, Hipot Tester , Relay Tester and so on for more than 10 years.
After several years' development, our products have become high intelligent and wide coverage. And our company has become one of the leading manufacturer of oil purifier and electrical testing equipment in China;
We have developed sales channels in many countries such as UAE, Saudi Arabia, Iran, Malaysia, Thailand, Pakistan, India, Germany, Belgium, USA, Mexico, Kenya, Nigeria, South Africa and other countries worldwide.
And we have gained strong advantage and high reputation in international market.



Customer Visit and Workshop Show

Three Phase Overcurrent Relay Tester Protection Relay Test Set

 

Certificates

Three Phase Overcurrent Relay Tester Protection Relay Test Set


Oversea Exhibition

Three Phase Overcurrent Relay Tester Protection Relay Test Set


Philippine 2023

Three Phase Overcurrent Relay Tester Protection Relay Test Set

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2007

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
100800000 RMB
Plant Area
>2000 square meters